Xagio SEO - AI Powered SEO 7.1.0.26

Does Xagio SEO - AI Powered SEO work with WordPress 6.9 and PHP 8.1.12? A smoke test was performed on .

Summary

Errors
2PHP fatal errors
22PHP warnings
13PHP deprecation warnings
2JavaScript exceptions
All test pages loaded successfully
No resource errors
Performance

Memory usage: 1.1 MiB
The average PHP memory usage increased by this amount after activating by the plugin.

Page speed impact: 0.351 seconds
The average page load time increased by this amount after activating the plugin.

Environment
WordPress version6.9
PHP version8.1.12
MySQL version10.6.10
PHP memory limit512M
Plugin Info
Last updated
Active installs 10,000+
WordPress.org page https://wordpress.org/plugins/xagio-seo/
Badges

WordPress compatibility badge PHP compatibility badge

Get badge code

Pages 19

Plugins ‹ Test site — WordPress

Page screenshot: Plugins ‹ Test site — WordPress
URL /wp-admin/plugins.php?plugin_status=all&paged=1&s
Requested URL /wp-admin/plugins.php?action=activate&plugin=xagio-seo%2Fxagio-seo.php&plugin_status=all&paged=1&s&_wpnonce=493ae76029
Aspect after-activation
HTTP status 200
Load time 1.893 s
Memory usage 12.68 MiB
JS errors None
Resource errors None

Xagio

Page screenshot: Xagio
URL /wp-admin/admin.php?page=xagio-dashboard
Aspect menu-item
HTTP status 200
Load time 2.054 s
Memory usage 4.91 MiB
JS errors
[
    {
        "message": "TypeError: Cannot read properties of undefined (reading 'text')\n    at Object.success (/wp-content/plugins/xagio-seo/modules/dashboard/dashboard.js?ver=7.1.0.26:106:48)\n    at c (/wp-admin/load-scripts.php?c=0&load%5Bchunk_0%5D=jquery-core,jquery-migrate,utils&ver=6.9:2:25304)\n    at Object.fireWith [as resolveWith] (/wp-admin/load-scripts.php?c=0&load%5Bchunk_0%5D=jquery-core,jquery-migrate,utils&ver=6.9:2:26053)\n    at l (/wp-admin/load-scripts.php?c=0&load%5Bchunk_0%5D=jquery-core,jquery-migrate,utils&ver=6.9:2:77782)\n    at XMLHttpRequest.<anonymous> (/wp-admin/load-scripts.php?c=0&load%5Bchunk_0%5D=jquery-core,jquery-migrate,utils&ver=6.9:2:80265)",
        "trace": null,
        "code": null
    }
]
Resource errors None

Xagio → Agent X

Page screenshot: Xagio → Agent X
URL /wp-admin/admin.php?page=xagio-ocw
Aspect menu-item
HTTP status 200
Load time 1.304 s
Memory usage 4.95 MiB
JS errors None
Resource errors None

Xagio → Xagio Settings

Page screenshot: Xagio → Xagio Settings
URL /wp-admin/admin.php?page=xagio-settings
Aspect menu-item
HTTP status 200
Load time 0.690 s
Memory usage 4.99 MiB
JS errors None
Resource errors None

Xagio → SEO Settings

Page screenshot: Xagio → SEO Settings
URL /wp-admin/admin.php?page=xagio-seo
Aspect menu-item
HTTP status 200
Load time 1.036 s
Memory usage 4.96 MiB
JS errors None
Resource errors None

Xagio → Project Planner

Page screenshot: Xagio → Project Planner
URL /wp-admin/admin.php?page=xagio-projectplanner
Aspect menu-item
HTTP status 200
Load time 1.098 s
Memory usage 5.38 MiB
JS errors
[
    {
        "message": "TypeError: Cannot read properties of undefined (reading 'text')\n    at Object.success (/wp-content/plugins/xagio-seo/modules/projectplanner/projectplanner.js?ver=7.1.0.26:1243:109)\n    at c (/wp-admin/load-scripts.php?c=0&load%5Bchunk_0%5D=jquery-core,jquery-migrate,utils,moxiejs,plupload&ver=6.9:2:25304)\n    at Object.fireWith [as resolveWith] (/wp-admin/load-scripts.php?c=0&load%5Bchunk_0%5D=jquery-core,jquery-migrate,utils,moxiejs,plupload&ver=6.9:2:26053)\n    at l (/wp-admin/load-scripts.php?c=0&load%5Bchunk_0%5D=jquery-core,jquery-migrate,utils,moxiejs,plupload&ver=6.9:2:77782)\n    at XMLHttpRequest.<anonymous> (/wp-admin/load-scripts.php?c=0&load%5Bchunk_0%5D=jquery-core,jquery-migrate,utils,moxiejs,plupload&ver=6.9:2:80265)",
        "trace": null,
        "code": null
    }
]
Resource errors None

Xagio → Niche Hunter

Page screenshot: Xagio → Niche Hunter
URL /wp-admin/admin.php?page=xagio-nichehunter
Aspect menu-item
HTTP status 200
Load time 0.771 s
Memory usage 4.91 MiB
JS errors None
Resource errors None

Xagio → Sitemaps

Page screenshot: Xagio → Sitemaps
URL /wp-admin/admin.php?page=xagio-sitemaps
Aspect menu-item
HTTP status 200
Load time 0.587 s
Memory usage 4.91 MiB
JS errors None
Resource errors None

Xagio → 301 & 404

Page screenshot: Xagio → 301 & 404
URL /wp-admin/admin.php?page=xagio-redirects
Aspect menu-item
HTTP status 200
Load time 0.460 s
Memory usage N/A
JS errors None
Resource errors None

Xagio → Silo Builder

Page screenshot: Xagio → Silo Builder
URL /wp-admin/admin.php?page=xagio-silobuilder
Aspect menu-item
HTTP status 200
Load time 0.767 s
Memory usage 4.91 MiB
JS errors None
Resource errors None

Xagio → Link Manager

Page screenshot: Xagio → Link Manager
URL /wp-admin/admin.php?page=xagio-linkmanagement
Aspect menu-item
HTTP status 200
Load time 0.597 s
Memory usage 4.91 MiB
JS errors None
Resource errors None

Xagio → Reviews

Page screenshot: Xagio → Reviews
URL /wp-admin/admin.php?page=xagio-reviews
Aspect menu-item
HTTP status 200
Load time 0.628 s
Memory usage 4.91 MiB
JS errors None
Resource errors None

Xagio → Backup & Restore

Page screenshot: Xagio → Backup & Restore
URL /wp-admin/admin.php?page=xagio-backups
Aspect menu-item
HTTP status 200
Load time 0.862 s
Memory usage 4.91 MiB
JS errors None
Resource errors None

Xagio → Clone

Page screenshot: Xagio → Clone
URL /wp-admin/admin.php?page=xagio-clone
Aspect menu-item
HTTP status 200
Load time 0.654 s
Memory usage 4.91 MiB
JS errors None
Resource errors None

Xagio → Rescue Center

Page screenshot: Xagio → Rescue Center
URL /wp-admin/admin.php?page=xagio-rescuecenter
Aspect menu-item
HTTP status 200
Load time 2.184 s
Memory usage 10.71 MiB
JS errors None
Resource errors None

Xagio → Developer Test

Page screenshot: Xagio → Developer Test
URL /wp-admin/admin.php?page=xagio-test
Aspect menu-item
HTTP status 200
Load time 0.725 s
Memory usage 4.91 MiB
JS errors None
Resource errors None

Test site – Just another WordPress site

Page screenshot: Test site – Just another WordPress site
URL /
Aspect front-page
HTTP status 200
Load time 0.604 s
Memory usage 4.83 MiB
JS errors None
Resource errors None

Add Post ‹ Test site — WordPress

Page screenshot: Add Post ‹ Test site — WordPress
URL /wp-admin/post-new.php
Aspect new-meta-boxes
HTTP status 200
Load time 1.139 s
Memory usage 7.27 MiB
JS errors None
Resource errors None

Add Page ‹ Test site — WordPress

Page screenshot: Add Page ‹ Test site — WordPress
URL /wp-admin/post-new.php?post_type=page
Aspect new-meta-boxes
HTTP status 200
Load time 1.169 s
Memory usage 7.25 MiB
JS errors None
Resource errors None

Benchmark

URL Load time Memory usage
Inactive Active Change Inactive Active Change
/wp-admin/index.php0.435 s0.752 s+0.317 s3.77 MiB4.91 MiB+ 1.14 MiB
/wp-admin/edit.php0.363 s0.657 s+0.294 s3.78 MiB4.91 MiB+ 1.13 MiB
/wp-admin/post-new.php0.866 s2.219 s+1.353 s6.3 MiB7.27 MiB+ 987.48 KiB
/wp-admin/upload.php0.479 s0.759 s+0.280 s3.74 MiB4.91 MiB+ 1.18 MiB
/wp-admin/options-writing.php0.352 s0.624 s+0.272 s3.71 MiB4.91 MiB+ 1.2 MiB
/wp-admin/media-new.php0.569 s0.595 s+0.026 s3.7 MiB4.91 MiB+ 1.21 MiB
/wp-admin/edit-tags.php?taxonomy=category0.344 s0.616 s+0.272 s3.71 MiB4.91 MiB+ 1.2 MiB
/wp-admin/post-new.php?post_type=page0.740 s1.226 s+0.486 s6.29 MiB7.25 MiB+ 980.97 KiB
/wp-admin/options-discussion.php0.466 s0.687 s+0.221 s3.71 MiB4.91 MiB+ 1.2 MiB
/wp-admin/edit-comments.php0.339 s0.648 s+0.309 s3.73 MiB4.91 MiB+ 1.18 MiB
/0.473 s0.506 s+0.033 s4.1 MiB4.82 MiB+ 741.3 KiB
Average 0.493 s0.844 s+0.351 s4.23 MiB5.33 MiB+ 1.1 MiB

Code Statistics

Note: Third-party libraries and minified JS/CSS files are excluded from these statistics where possible, so the numbers you see here may be lower than those reported by other tools.

PHP
JavaScript
CSS
Language % Lines of code Comment lines Files
PHP48.8%45,0506,29566
JavaScript29.3%27,03686928
CSS19.8%18,30135922
JSON1.8%1,68201
XSLT0.1%12321
SVG0.1%90088
XML0.0%1242
HTML0.0%1101
Total 92,305 7,529 209

PHP Code Analysis | More results »

Lines of code 30,392
Total complexity 5,832
Median class complexity 53.0
Median method complexity 4.0
Most complex class XAGIO_API
Most complex function XAGIO_MODEL_OCW::runWizard()
Classes 45
Methods 875
Functions 50

Additions

Things that the plugin adds to the site. This section is not intended to be comprehensive. The test tool only looks for a few specific types of added content.

Database Tables 13

Options wp_options 15

User Metadata wp_usermeta 1

Meta Boxes

{
    "post": {
        "xagio_seo": {
            "title": "Xagio",
            "context": "advanced"
        }
    },
    "page": {
        "xagio_seo": {
            "title": "Xagio",
            "context": "advanced"
        }
    }
}

PHP Error Log 53 lines

[03-Dec-2025 16:33:48 UTC] PHP Warning:  foreach() argument must be of type array|object, bool given in /wp-content/plugins/xagio-seo/modules/ocw/page.php on line 2012
[03-Dec-2025 16:33:57 UTC] PHP Warning:  Undefined variable $xagio_country in /wp-content/plugins/xagio-seo/modules/nichehunter/page.php on line 1031
[03-Dec-2025 16:33:57 UTC] PHP Deprecated:  preg_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /wp-includes/kses.php on line 2018
[03-Dec-2025 16:33:57 UTC] PHP Fatal error:  Uncaught TypeError: Cannot access offset of type string on string in /wp-content/plugins/xagio-seo/modules/nichehunter/models/xagio_nichehunter.php:195
Stack trace:
#0 /wp-includes/class-wp-hook.php(341): XAGIO_MODEL_NICHEHUNTER::getHistory()
#1 /wp-includes/class-wp-hook.php(365): WP_Hook->apply_filters()
#2 /wp-includes/plugin.php(522): WP_Hook->do_action()
#3 /wp-admin/admin-post.php(82): do_action()
#4 {main}
  thrown in /wp-content/plugins/xagio-seo/modules/nichehunter/models/xagio_nichehunter.php on line 195
[03-Dec-2025 16:34:00 UTC] PHP Fatal error:  Uncaught TypeError: implode(): Argument #2 ($array) must be of type ?array, bool given in /wp-content/plugins/xagio-seo/modules/redirects/page.php:221
Stack trace:
#0 /wp-content/plugins/xagio-seo/modules/redirects/page.php(221): implode()
#1 /wp-content/plugins/xagio-seo/helpers.php(566): require_once('...')
#2 /wp-includes/class-wp-hook.php(341): xagio_load_page()
#3 /wp-includes/class-wp-hook.php(365): WP_Hook->apply_filters()
#4 /wp-includes/plugin.php(522): WP_Hook->do_action()
#5 /wp-admin/admin.php(264): do_action()
#6 {main}
  thrown in /wp-content/plugins/xagio-seo/modules/redirects/page.php on line 221
[03-Dec-2025 16:34:14 UTC] PHP Deprecated:  Function WP_Dependencies-&gt;add_data() was called with an argument that is <strong>deprecated</strong> since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /wp-includes/functions.php on line 6131
[03-Dec-2025 16:34:14 UTC] PHP Deprecated:  Function WP_Dependencies-&gt;add_data() was called with an argument that is <strong>deprecated</strong> since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /wp-includes/functions.php on line 6131
[03-Dec-2025 16:34:18 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 173
[03-Dec-2025 16:34:18 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 174
[03-Dec-2025 16:34:18 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 196
[03-Dec-2025 16:34:18 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 217
[03-Dec-2025 16:34:18 UTC] PHP Deprecated:  Automatic conversion of false to array is deprecated in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 1556
[03-Dec-2025 16:34:18 UTC] PHP Deprecated:  Automatic conversion of false to array is deprecated in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 1583
[03-Dec-2025 16:34:18 UTC] PHP Warning:  foreach() argument must be of type array|object, bool given in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 1586
[03-Dec-2025 16:34:26 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 173
[03-Dec-2025 16:34:26 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 174
[03-Dec-2025 16:34:26 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 196
[03-Dec-2025 16:34:26 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 217
[03-Dec-2025 16:34:26 UTC] PHP Deprecated:  Automatic conversion of false to array is deprecated in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 1556
[03-Dec-2025 16:34:26 UTC] PHP Deprecated:  Automatic conversion of false to array is deprecated in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 1583
[03-Dec-2025 16:34:26 UTC] PHP Warning:  foreach() argument must be of type array|object, bool given in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 1586
[03-Dec-2025 16:34:32 UTC] PHP Deprecated:  Function WP_Dependencies-&gt;add_data() was called with an argument that is <strong>deprecated</strong> since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /wp-includes/functions.php on line 6131
[03-Dec-2025 16:34:32 UTC] PHP Deprecated:  Function WP_Dependencies-&gt;add_data() was called with an argument that is <strong>deprecated</strong> since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /wp-includes/functions.php on line 6131
[03-Dec-2025 16:34:33 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 173
[03-Dec-2025 16:34:33 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 174
[03-Dec-2025 16:34:33 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 196
[03-Dec-2025 16:34:33 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 217
[03-Dec-2025 16:34:33 UTC] PHP Deprecated:  Automatic conversion of false to array is deprecated in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 1556
[03-Dec-2025 16:34:33 UTC] PHP Deprecated:  Automatic conversion of false to array is deprecated in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 1583
[03-Dec-2025 16:34:33 UTC] PHP Warning:  foreach() argument must be of type array|object, bool given in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 1586
[03-Dec-2025 16:34:38 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 173
[03-Dec-2025 16:34:38 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 174
[03-Dec-2025 16:34:38 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 196
[03-Dec-2025 16:34:38 UTC] PHP Warning:  Trying to access array offset on value of type bool in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 217
[03-Dec-2025 16:34:38 UTC] PHP Deprecated:  Automatic conversion of false to array is deprecated in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 1556
[03-Dec-2025 16:34:38 UTC] PHP Deprecated:  Automatic conversion of false to array is deprecated in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 1583
[03-Dec-2025 16:34:38 UTC] PHP Warning:  foreach() argument must be of type array|object, bool given in /wp-content/plugins/xagio-seo/modules/seo/metabox/seo.php on line 1586
See also: All tests for this plugin